Introducing CCP4I2

Liz Potterton, March 2012

Here are a few screenshots of the new CCP4 GUI to give some idea how it will appear to crystallographers.

The main window of CCP4i2 with an overview of the jobs in the project on the left and an interface to starting an automatic model building job on the right. After this job is started the user can follow its progress.

The Buccaneer and Refmac sub-jobs are shown in the project window on the left and a job report is updated in real-time on the right. In this case the job report shows a graph of model completeness with cycle. When the job completes a fuller report is presented with graphs, tables, pictures, links and hints for what to do next.

Last modified: Fri Mar 9 17:32:01 GMT 2012